Oilless Compressor Head SL-165 3.7KW Oil Free Scroll Compressor Airend
Technical requirement
1. It is not allowed to pull the exhaust pipe during assembly and transportation, and pay attention to protecting the thread.
2. Do not impact the whole machine during assembly, handling and transportation
3. Do not carry plastic parts during the handling process to prevent damage to plastic parts during the handling process
4. The exhaust pipe is not locked when it leaves the factory, and the torque of the installation thread is (30-60)±4%N.m
5. Safety valve:
When connecting the unit, set the opening pressure of the safety valve to 1.05Mpa, and install the safety valve behind the exhaust radiator.
6. Check valve:
6.1 The check valve of the connecting unit should be installed after the exhaust radiator is installed, and the structure of the check valve should be a horizontal
swing valve or a lifting check valve, with a temperature resistance of -40ºC to 150ºC, and the number of opening and closing times > 180,000
6.2 If there is no radiator mechanism, the structure of the check valve should be horizontal swing or lifting check valve. Temperature resistance -40ºC to 280ºC, opening and closing times > 180,000 times
7. Temperature sensor connector M8-6H screw depth 15
Compressor temperature control logic:
Compressor body temperature Operating temperature range :-40ºC to 85ºC Compressor body temperature >90 ° C, the compressor stops running, body temperature drops to 65 ° C, the compressor can run
8. Do not move plastic parts when the compressor is moving. To avoid damage, use the compressor lifting port to lift the compressor
9. Installation position requirements:
The cooling outlet of the compressor used for vehicle installation can exclude the position of the vehicle outlet, and the suction port is connected to the closed control box by a hose connection.
10. The unit can not be reversed, the first debugging pay attention to the compressor steering, rotation direction facing the pulley, rotation counterclockwise
11. The inner diameter of the external pipe system should be φ10 or greater
12. The footing is pressed by M8 bolts, the torque is 22±4%N.m
13. The belt adopts SPZ type with double 500-600N tightening force.